The site decides the delivery, not the aircraft

Almost every delivery drone project that stops, stops because there was nowhere acceptable to put the package down.

Why the last mile is the expensive one

Flying between two points is the solved part. An aircraft that can carry two kilos ten kilometres exists and can be bought. What has not been solved is the thirty seconds at each end.

At the depot end somebody has to load it, check it and launch it, and if that takes four minutes then the aircraft spends more time on the ground than in the air and the economics never close.

At the receiving end there has to be a place to descend into that is clear of people, wires, branches and wind, that the recipient can reach, and that is the same place tomorrow. In a Swedish town that place is rarely obvious.

A delivery route that curves around a no fly cone between a depot and a door A depot on the left and a door on the right sit on a ground line. A straight line joins them and is marked straight line, not available. Above it a drawn curve bends up and over a violet cone marked no fly. A small four rotor aircraft sits on the curve carrying a package marked one point eight kilos, with a glowing line falling from it toward the ground. DEPOT DOOR STRAIGHT LINE . NOT AVAILABLE NO FLY 1.8 kg DEPOT . ROUTE . DOOR

The route

A straight line is not available

The direct path between two points crosses whatever happens to be between them, and some of that is airspace you may not enter with the permission you hold. The flown route is longer than the drawn one, always.

Every detour costs battery, and battery was already the binding constraint. This is why range has to be planned against the actual route and not against the distance on a map, and why a delivery that looks feasible at eight kilometres often is not.

A landing site seen from above with obstacles and wind widening the circle Three concentric circles are drawn from above with a crosshair through them and a blinking point at the centre, marked touchdown one point two metres. Three violet squares stand around the circles marked obstacle. On the right a blue arrow marked seven metres per second points away from a curved line, under the words wind widens it. TOUCHDOWN . 1.2 m OBSTACLE 7 m/s WIND WIDENS IT THE SITE DECIDES THE DELIVERY, NOT THE AIRCRAFT
En operatör vid drönarens kontroll
A field crew setting up. Most of the work in an unmanned operation happens with everybody still standing on the ground.

The site

Wind makes the landing circle bigger than anyone expects

A landing site is not a point. It is a circle, sized by the aircraft's accuracy plus what the wind does to it on the way down, plus a margin for the gust that arrives at the wrong moment.

Obstacles shrink the usable circle from the outside while wind grows the required one from the inside, and those two numbers meeting is the question of whether a given address can be served at all.

Surveying candidate sites is unglamorous work and it is the part that decides whether the project is real. We would rather find out in week one than after an airframe has been bought.

The honest version of this is that some addresses cannot be served, and that the survey is what tells you which ones. A route list with three impossible stops on it is worth more than an optimistic one.

The questions

What has to be answered before an airframe is chosen

In that order. Reversing it is how projects acquire an aircraft that cannot do the job.

QuestionWhy it comes firstWhat it rules out
What is being movedMass and shape set the whole aircraftAnything that cannot carry it with reserve
Who is underneath the routeIt decides the legal categoryRoutes that need an approval you do not have
Where does it landA site is harder to find than an aircraftAddresses that have no usable circle
How oftenGround time per flight decides the economicsAny plan where loading takes longer than flying

Three of these four are answered on the ground, which is a fair summary of unmanned aviation generally.

Or write here

Three fields, and a person reads it

Name, an address we can answer to, and what you are trying to build. You get a reference back straight away.

We use this to answer you and, where it fits, to prepare a scope. The lawful basis is steps taken at your own request before a contract. It is stored on our own server in the European Union, never passed to anyone, and deleted after twelve months if it does not become an engagement. The full notice is on the legal page.

A delivery route that curves around a no fly cone between a depot and a door A depot on the left and a door on the right sit on a ground line. A straight line joins them and is marked straight line, not available. Above it a drawn curve bends up and over a violet cone marked no fly. A small four rotor aircraft sits on the curve carrying a package marked one point eight kilos, with a glowing line falling from it toward the ground. DEPOT DOOR STRAIGHT LINE . NOT AVAILABLE NO FLY 1.8 kg DEPOT . ROUTE . DOOR

What are you trying to deliver?

Tell us the package and the two ends of the route. The answer is sometimes that a van is still better, and we will say so.